Odduck

Odduck: Adventures in Boat Restoration

July 2013

07/23/13

The Best Laid Plans...

As a result of the serious illness of a family member and a knee injury I incurred in mid-June that led to surgery on it mid-July, progress on Odduck slowed. The biggest step forward was having 57 holes in the boat welded closed. The transom had 15 holes from a speedometer and its cable, a transducer, maybe some anodes and a couple of lift rings I wanted repositioned. There were also multiple holes on the rear and side decks where a loran antenna and fishing equipment brackets had been. I'm changing the forward navigation lights, so those holes needed filling, as did several others on the bow where a horn had been repositioned. So, as long as he was welding the below-water holes, I had him do them all. I ground them down with an electric drill and coarse sandpaper. For...

Posted at 11:13 AM | Permalink | Comments

About This Blog

Follow longtime HeartLand Boating contributor Gary Kramer on his latest undertaking: rebuilding a 1987, 24-foot, aluminum Crestliner Sabre Mid-Cabin Day Cruiser from the hull up.

Archives

Categories

Feed

Atom Feed Subscribe to the Odduck Feed »

Recent Posts